IDOT – Pump Station #24 Reconstruction, I-190 at I-294

Tecma, along with its joint venturepartner Stantec, provided Phase III construction engineering services for this $20 Million project, which was completed in the Spring of 2014.   Work included the installation of a new drainage system, and extensive site improvements (including retaining wall construction and expressway ramp improvements).  The reconstruction of the IDOT Pump Station # 24 building and equipment included demolition and material removal, concrete work, structural steel, reinforcement bars, glass block and masonry work, doors and frame, single ply roofing, sheet metal work, and painting.  The improvement also included mechanical work consisting of removal of existing pumps including motors, fabricated metal, bowls, impellers, heating and ventilation equipment, piping for recirculation system and electrical distribution, control, instrumentation, intrusion, conduit and wiring, electrical work including a new electric service to the facility, incorporating new exterior transformers, and modification of the existing Supervisory and Data Acquisition (SCADA) System.