IDOT –US Route 45 Reconstruction from IL 120 to Washington Street, Lake County

Tecma, as the prime consultant for this project, provided Phase III construction engineering services for this $13.1 Million Contract which was completed in 2012.  The project included placement of approximately 2 miles of 9 ¾ inch mainline PCC jointed pavement (2 lanes in each direction and turn lanes), full depth HMA pavement at cross streets, a new drainage system, traffic signal modernization/interconnect work, placement of lightweight cellular concrete, and the construction of a new overflow ditch for Gages Lake.  Through their work on Contract 60956, Tecma staff developed strong, professional working relationships with key project stakeholders including the various IDOT Bureaus, the U.S. Army Corps of Engineers, the Lake County Stormwater Management Commission, the Soil & Water Conservation District of Lake County, the Lake County Division of Transportation, the Village of Third Lake, Warren Township, the Village of Grayslake, and area residents/property owners.  Tecma personnel successfully managed project specific challenges on this contract including extensive coordination with private utility companies (including North Shore Gas, ComEd, Comcast, AT&T, and TDS Metrocom), ensuring safe staged construction at the intersection of US 45 and Washington Street for placement of 4 feet of cellular fill/PCC pavement, and diligent erosion control inspection/reporting/enforcement as per 404 permit requirements.  The Illinois Department of Transportation awarded Tecma the 2012 DISTRICT-WIDE DBE AWARD FOR EXCEPTIONAL PHASE III CONSULTING ENGINEERING SERVICES for this project.

IDOT –US Route 45 Reconstruction from IL 120 to IL 137, Lake County

Tecma, as the prime consultatnt for this project, provided Phase III construction engineering services for this $9 Million Contract which was completed in 2011.  The project included placement of 1.5 miles of 9 ½ inch mainline PCC jointed pavement (2 lanes in each direction and turn lanes), full depth HMA pavement at cross streets, 0.5 miles of HMA resurfacing work from IL 137 to Tempel Drive, landscaped median work, a new drainage system, traffic signal modernization and interconnect work, and removal/disposal of non-special waste.  Through their work on Contract 60957, Tecma staff developed strong, professional working relationships with key project stakeholders including the various IDOT Bureaus, the Lake County Stormwater Management Commission, the Soil & Water Conservation District of Lake County, the Lake County Division of Transportation, the Village of Libertyville, Libertyville Township, the Village of Grayslake, and area schools/residents/property owners.  Tecma successfully managed project challenges including poor soils conditions in the area, removal and disposal of non-special waste, traffic control and protection, and maintenance of access issues.

Other Current Projects

IDOT –I-90 at I-290/Congress Parkway and Westbound Mainline, Jane Byrne (Circle) Interchange

IDOT –I-55 Bridge Deck Widening and Replacement at US 6.

IDOT –East River Road/Cumberland Flyover Bridge Reconstruction over I-90.

IDOT –US 45 (Milburn Bypass), North of Milburn Road to North of Grass Lake Road.

CDOT –Adams Street Bascule Bridge and Viaduct.

ISTHA–Fox River Bridge Reconstruction and Additional Lane, from I-39 to IL 25.

Completed:

IDOT –IL 59 Reconstruction from Ferry Road to Aurora Ave.  Oct 2016

IDOT –US 20 at McLean Blvd Interchange Reconstruction.  Aug 2016

ISTHA–IL 25 Bridge and Ramp Reconstruction over I-90.  Jan 2016

IDOT –US 45 (Lagrange Road) Reconstruction from 131st St. to 179th St.  Aug 2015

IDOT –Cumberland Ave Bridge Reconstruction over I-90/CTA Blue Line.Nov 2014

ISTHA–I-294 Northbound Roadway and Bridge Rehabilitation from 95th Street to Cermak Road Plaza.  March 2013

IDOT –I-80 Expressway Rehabilitation from the Grundy County Line to US 30.  Nov 2011

ISTHA–I-355 Overlay and Bridge Rehabilitation from Army Trail Road to Butterfield Road.  Sept 2010

IDOT – Dan Ryan Expressway Rehabilitation of Elevated Structures NB & SB Roosevelt to 31st St.  2006

IDOT –EdensExpressway Resurfacing, Bridge Repair, and Bridge Deck Overlay from Lawrence Ave to Lake Cook Road.

ISTHA–I-355 Widening and Overlay from 75th Street to the Reagan Memorial Tollway.

CDOT –Arterial Street Resurfacing Program

CDOT –ADA Ramp Menu Program

CDOT –Harper Avenue Reconstruction