Illinois Tollway – I-90 at Barrington Road Interchange

Tecma is currently serving as the Prime Consultant providing Phase III Construction Engineering Services for this $35 Million contract, which is scheduled to be 100 % complete in the Fall of 2017.  The project includes reconstruction & reconfiguration of Ramps A, B, C, C1, D1, D; construction of new ramps E, F, G, H; reconstruction/widening of Barrington Road from Hassell Road to Central Road; and widening of Barrington Road from Higgins to Hassell Road.  Scope of work also included construction of two shared use path spurs, new Toll Plazas and Buildings on Ramps D, F, and G; construction of parking lot for Plaza 10 and Communication Tower; lighting and traffic signals, relocation of NSMJAWA 30” water main, drainage, MSE walls, overhead sign structure, segmental concrete block wall, prefabricated control building, three sided precast concrete structures, and erosion/sediment control work.