IDOT – Reconstruction of WB I-290 Auxiliary Lanes from Peoria to Racine, Jane Byrne (Circle) Interchange

Tecma is currently serving as the Prime Consultant providing Phase III Construction Engineering Services for this $35 Million project, which is scheduled to be completed in the Spring of 2018.

The project includes WB I-290 expressway auxiliary lane construction, retaining wall/noisewall construction, electrical work, installation of a new drainage system including 78 inch main drain, lighting, ITS, and water main construction.  Project challenges included extensive coordination with abutting contracts/CDOT/CDOWM/UIC, and safely performing retaining wall construction/main drain installation in very close proximity to existing buildings.